These are the questions Modesto property owners ask us most: how
estimates work, where we travel, how long new concrete takes to cure,
whether a driveway or patio needs a permit, and how summer heat changes
a pour. If yours is not here, call or text and we will answer it.
Yes. We come out to the property, measure the area and look at the existing surface. Then you get a written estimate for the work. Both the visit and the estimate are free, so call or text (209) 606-9904 to set one up.
What areas do you serve?
We are based in Modesto and work about 65 miles out from there. That reaches the Sacramento area to the north and the Fresno area to the south. Stockton, Turlock, Manteca, Tracy, Merced, Lodi, Ceres, Oakdale, Riverbank and Patterson are all inside that range. See the full list of towns we cover for the rest.
Do you do commercial work as well as homes?
Yes. Most of our work is residential flatwork, but we also pour for businesses. That includes slabs, equipment pads, dumpster pads, curb and gutter and parking-lot concrete. This past year we did industrial work for manufacturing and bottling facilities in the Modesto area.
Do you do stamped and decorative concrete?
Yes. We stamp and color new concrete in-house. Ashlar slate, flagstone, wood plank and cobblestone patterns are common on patios and walkways, with integral or antiqued color. There is more on stamped and colored concrete if you want the detail.
How long before I can walk or drive on new concrete?
Foot traffic is usually fine after about a day. Vehicles should stay off for about a week. Concrete keeps hardening after that, and most of its strength comes in the first month. We give you the timing for your pour before we leave the site.
Do I need a permit for a driveway or patio in Modesto?
A driveway or patio on your own property usually does not need a building permit in Modesto. Work in the public right of way is different. The city's Land Development Engineering office issues encroachment permits for curb, gutter, sidewalk and driveway approaches. Building permits go through the Building Safety Division, so confirm with the city before we pour.
Does Valley summer heat change how you pour?
Yes. Hot, dry days pull water out of fresh concrete fast, so summer pours start early in the morning. We keep the surface damp or use a curing compound so the slab cures instead of drying out. In winter we work around rain and cold nights.
What should I have ready before the estimate?
Rough measurements help, even if you paced them off. Tell us what the concrete is for, since a shed pad and a driveway need different thickness. If you have a finish in mind, photos of what you like are useful. For a foundation or an addition, have the plans handy.